We have been very busy laying track, installing turnouts and switch machines, running bus wire, soldering drops from
the track to the bus wire, and hooking up the control panels. Virtually all the 'construction' is complete.
San Bernardino "A" Yard
That is George underneath the yard, soldering the drops to the bus wire. Stan is busy working on wiring up a control
panel.
Heino is busy installing the Y at Summit. It is on a hinged deck that can be lifted to give access to the track
underneath. Note the track in Cajon on the left of the photo, and Sullivan's curve heading up to Summit.