Building Progress Photos | Award Winning Models | Award Winning Model (2) | Award Winning Models (3) | Nov 2005 | Sep 2005 | Jun 2005 | Apr 2005 | Mar 2005 | Feb 2005 | Jan 2005 | Nov 2004 | Oct 2004 | Sep 2004 | Aug 2004 | Jul 2004 | Apr 2004 | DCC Command Station | Mar 2004 | Feb 2004 | Jan 2004 | Dec 2003
Scale Rails of SW Florida Trainroom
Jan 2005

Joint Line Construction Begins

Now that the upper level of the layout is fundamentally complete (at least all the messy stuff like plaster and epoxy), construction can begin on the lower level.  This will represent the line from Denver to Pueblo, Colorado, called the Joint Line as it was used by the D&RGW, the ATSF, and the UP jointly.  Much of the actual construction will be done on the work bench and then moved into place.

joint-line-begins-001.jpg

What was a "duck-under" that went under the Y at Summit is being framed in to provide a wall to support the lower level bench.

joint-line-begins-003.jpg

The bench that was at the lower level along the east wall of the building was lowered 3 1/2 " to create more headroom for the Joint Line.