Building Progress Photos | Award Winning Models | Award Winning Model (2) | Award Winning Models (3) | Nov 2005 | Sep 2005 | Jun 2005 | Apr 2005 | Mar 2005 | Feb 2005 | Jan 2005 | Nov 2004 | Oct 2004 | Sep 2004 | Aug 2004 | Jul 2004 | Apr 2004 | DCC Command Station | Mar 2004 | Feb 2004 | Jan 2004 | Dec 2003
Scale Rails of SW Florida Trainroom
June 2005

Quite a bit of progress has been made over the last couple of months.

6-11-05-001.jpg

The sub-roadbed has been installed for the Mojave Northern RR, which went from the quarry in the Mojave mountains to the Southwest Portland Cement plant in Victorville.

swpc-5-24-05.jpg

The above photo show the Rock Dump and Crusher Building, with the trestle.  This is where the Mojave Northern RR brought the rock from the quarry.  The Crusher Building is the only one done.  The others are mockups from card stock, with a mailing tube to give perspective on the silo height.

6-11-05castlerock.jpg

The end of Castle Rock has been finished with a curved connection of track to the installed Colorado Springs section, on the other side of the partition.  Here you see the scenery work underway.

6-11-05-002.jpg

Here you can see the curved track coming into Colorado Springs, which is now installed.  All electrical from Denver through Castle Rock and to the end of Colorado Springs has been verified, and a locomotive has run all the way from Colorado Springs to Denver and back.

6-11-05-007.jpg

Dave (left) is admiring Heino's (right) hard work on putting the 30 stall roundhouse together.  Heino is making significant progress.

6-11-05-004.jpg

Stan has been busy scratch building lots of buildings to plans for Summit.  The above and below photos show Summit from two different angles.

6-11-05-005.jpg

6-11-05cajon.jpg

Stan also has finished scratch building the bunk house for Cajon, to go with all the other buildings he previously finished.  Looks good doesn't it?