Progress continues on details and structures on the LA Division 1. Track work is about done on the Joint Line.
This is the San Bernardino Depot which Stan is scratch building. He's doing a pretty good job too!
This shows the San Bernardino Roundhouse that Heino is building, as well as the turntable and the sand house.
The trackwork connecting Pueblo to the helix is now in place.
The track work and electrical controls for track power and turnouts is all installed. Once the track is certified it will get ballast.
This shows the AT&SF depot at Castle Rock that George built.
Scale Rails Home Page
E-Depot